What a great week we’ve had to be on site to take some shots of the progress of the Canoe development!  The West Wing is starting to be framed and is going up in a flash.  What a difference even a week can make!  Here is a short but sweet construction update:

East Wing:

  • The east side is currently having paper and siding done.
  • The decks are starting to get covered with membrane.
  • The roof is now fully shingled.
  • We are continuing with plumbing and electrical rough ins.

West Wing:

  • The west side has seen the elevator shaft gone up to full height and the framers are currently working on standing 1st floor walls and building floors.

Keep your eye out on our Facebook page for more pictures!  Want to live in Auburn Bay and be a part of our amazing Canoe family?  Give us a call to book a show home tour at 403-536-7282, or visit us and register online at aviurban.com/canoe