After a dreary week, the sun is finally shining and spring is starting to feel closer! All crews were busy on site as usual, getting your new Calgary condo and townhomes closer to move in ready. All the construction terms can be found in our glossary. Here is the latest progress at The Block:

On the first floor, All fixtures are in and all painting is complete. Hardwood and baseboards have been installed! Finishing touches are all that’s left on these units. Planters and front exteriors are really going to wow those walking through these front doors.

On the second floor, These units are pretty much completed and looking awesome! Blinds have been installed and finishing touch ups started this week.

On the third floor, Kitchen cabinets, counter tops and sink fixtures are installed. This week painting has started which includes the feature colored doors and walls!

On the fourth floor, Electrical has been installed with rough ins almost complete, waiting on inspections. Sheeting is also being completed.

Townhomes– In the North Townhomes drywall is installed. Mudding and taping, the texturizing of these units is started. West Townhomes have been inspected and insulated, dry wall to be started this week.

In the parkade shacks have been removed and it’s being prepped for the cleaning/ pressure wash. Front entry way concrete has been poured (picture to follow once tarps have been removed) Final touches are being done on the exterior of the building. The cedar exterior on the East side fourth floor is being installed, and it looks really sharp!