Time flies when you are having fun in the sun, minus last week and the snow storm!  Things here at Edison are still on track and haven’t slowed down a bit! Beautiful day and lots of action on these new Calgary Townhomes, from the framers finishing roofs to siders laying some James Hardie board to homeowners moving in!

Building 17– Possessions fully completed on this building. Congrats to those of you moved in, hope you are enjoying your new home.

Building 18– Congrats to those who are moved and settling in! To those few moving in soon, we hope all goes well!

Building 15– These homes are in the final stage of touch ups with home owner walk-throughs happening and possessions the end of this month! Hope you are all getting excited!

Building 19– Drywall is complete. Now heading into the finishing stages meaning cabinets, doors, and trim are being installed with flooring and painting following. Exterior siding is completed and driveways are soon to be prepped and poured.

Building 14– The insulation is complete and dry walling has begun. Exterior siding is completed on this building.

Building 20– Starting spray foam and insulation. Siding is almost complete!

Building 13– Fire caulking and inspections are complete. Ready to start insulating. Siding is almost complete.

Building 12 & 11- All plumbing, HVAC and electrical rough ins are complete. Inspections to follow. Siding has started on building 12.

Building 5 & 10– Plumbing rough ins complete. HVAC and electrical now being installed.

Building 4– Roof is complete. Back framing on the interior.

Building 9 & 8– Shingling roof complete. Back framing on the interior.

Building 3– Third floor is framed. Now the trusses are being installed on the roof.

Such great progress is being made out here at Edison. Both visitor parking pads have been poured and a second garbage enclosure exterior is sided. Stay tuned until next month for more exciting updates!

Melissa @Edison