Savanna Urban Terraces: Construction Update

It’s been nearly two months since the ground breaking and start of construction in Savanna Urban Terraces and so much has changed already!

With phase one taking shape, we thought we’d share a breakdown on the construction progress for each building;

Building 1 – The framing and roof are nearing completion, and windows and doors have been delivered.

Building 2 –  Framing is well underway with the main floor almost complete and the second floor set to start soon.

Building 3 – Framing has begun on the main floor.

Buildings 4 & 5 – We’re getting closer to the start of construction.

Buildings  6, 7 & 8 – Will be released for sale at a later date.

 

Our new sales centre opens this Saturday! We encourage you to stop by between 12 and 5 p.m. for the Picnic in the Park event and take a tour of our new location, 9005 46 St NE. As a thanks for stopping by, we’ll give you vouchers to redeem at the Dumpling Hero and Kurry Up food trucks and send you home with some awesome summer swag. Plus, when you visit our new sales centre and our Homes by Avi showhomes you’ll be entered to win a $250 Visa gift card! 

TaraLynn @ Savanna