August at University District: Construction Update – January 2020

Happy 2020! I hope everyone was able to have a well deserved break and holidays.

So much exciting news with August as the roof is almost done! Once this is done, the trades will be able to start insulating and drywall. The plumbers have been working on rough ins and are up to 5 water lines. The electricians have not pulled wire yet from the 2nd to 6th floors, but are pretty much boxed out all the way up to 4th and some of 5th floor.

Meanwhile, progress in the parkade is still moving along steadily as the trades had been working hard through the cold snap last week.

I hope everyone is enjoying the warm up — it sure was a chilly week!

See you next month,

Shefali @ August