With only three buildings left to go, we’re getting close to the completion of Jackson at Walden!

Here’s an overview of all the progress we’ve been making:

Buildings 1, 2, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 – Completed and homeowners have taken possession.

Building 3 – Drywall and interior finishing – after insulation is complete, drywall is hung and taped in preparation for painting. This is also the stage for completing the ceiling texture. As the drywall goes on, the installation of all the finishes like cabinetry, light fixtures, flooring and paint can be underway.

Building 4: Rough-ins – this is the stage where we put everything behind the walls to make your home run; Ductwork is installed for the heating, ventilation and air conditioning system (HVAC).

Building 5 – Interior finishing – now you’ll see your house really start coming together, as drywall goes on and installation of all the finishes like cabinetry, light fixtures, flooring and paint are completed.

Building 13 – Complete with only 2 Jasmines on the courtyard left for possession.

Courtyard – The fireplace is finally in there and waiting to be fired up! We’re simply finishing off the area where the mailboxes will have their new home.