Maverick at Livingston: Construction Update

The construction progress in Maverick at Livingston is moving along so quickly, we almost can’t keep up. This is arguably the second most exciting part of building a new home because you finally get to see the finishing touches coming together, with the most exciting part being when we hand over your keys (obviously).

Here’s what we’ve been up to:

Parkade:  We are finishing off the walls and getting ready to put up storage lockers and paint.

Exterior: The stucco on the east side of the building is on its final coat. Hardie Board has been installed on the north and south sides, and the corrugated metal for patios will be on site next week. We are also working on the sidewalks and curbs of the site.

First floor: The cabinets are installed, the countertops are in, the flooring is laid, and doors and shelving are installed. Tile work is complete in the kitchen and bathrooms, and the suites look amazing. Next up, we’ll be walking through the suites with eyes wide open to check for any deficiencies.

Second floor: Cabinets, check; countertops, check. Next to check off is the flooring and tile work, which is underway and will be complete soon.

Third floor: Not quite as far along as the second floor, but getting very, very close. Cabinets and flooring are being installed and the suites are on their first coat of paint.

Fourth floor: Cabinets are going in, casing and baseboards are being installed, and these suites are starting to look likes homes.

And if you know someone in the market for a new home — Refer your friends, family or peers to Maverick at Livingston and when they purchase one of these gorgeous condos, we’ll pay you $5,000 — COLD. HARD. CASH. And the best part? You don’t even have to own a Homes by Avi home to qualify for this offer; it’s available to EVERYONE! All you need to do is pass along our contact details to anyone you think may be in the market for a new home and then sit back and watch the benjamins roll in.