With the landscaping done and only one building left to complete, we are so close to being finished here in Willow at Sherwood. I love seeing a community when the homes are completed, and all the landscaping is done too. You get to see how a drawing from a year ago comes to life. The finished look of the townhomes and the landscaping in Willow at Sherwood  really show cases the attention to detail Avi Urban puts into each of their communities.

Here is a break down of where each building is at:

  • Building 3, 4, 5, 6, 7, 8, 9 & 10 – Complete, all homeowners have moved in!
  • Building 2 -The finishing work is complete, cabinets, counter tops and flooring are all complete, the final touch-ups are finished as well and now homeowners have started to move in!
  • Building 1 – Insulation and drywall are complete, cabinets have arrived and are almost complete being installed into the homes, we’re even getting prepped to start the tile flooring. There is only one townhome left in this building with an end of Sept/Oct possession (approx.) It has access to a private green space from the deck and is right by the park/playground. Hurry before this last opportunity is gone!
  • Around the site – Landscaping is complete and just in time for summer! Final paint touch-ups and finishing details are going on the exteriors. We’re getting ready to fix up any damage to the curbs and sidwalks, once that and all the exterior maintenance is completed the final pave of Sherwood Row will happen.

Until next time